Site work, finishes and permanent power!

Site: We are preparing to pave the driveways and parking lots. Concrete flatwork is ongoing around the campus. Irrigation has begun on the play fields and between the buildings.

Buildings: Finishes are being installed in Building 100, 200, and 400. We should receive permanent power early next month, which will allow us to turn on the air conditioning and climatize the space and materials. This is especially important because it will allow us to install carpet and wood doors. Building 200 is in the drywall phase and is coming along nice!